High Combustion Efficiency Waste Management System Medical Solid Waste Incinerator

Product Details
After-sales Service: 1 Year
Warranty: 1 Year
Condition: New
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Gold Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Quality Assurance
The supplier provides quality assurance
R&D Capabilities
The supplier has 25 R&D engineers, you can check the Audit Report for more information
Product Certification
The supplier's products already have relevant certification qualifications, including:
CE
to see all verified strength labels (20)
  • High Combustion Efficiency Waste Management System Medical Solid Waste Incinerator
  • High Combustion Efficiency Waste Management System Medical Solid Waste Incinerator
  • High Combustion Efficiency Waste Management System Medical Solid Waste Incinerator
  • High Combustion Efficiency Waste Management System Medical Solid Waste Incinerator
  • High Combustion Efficiency Waste Management System Medical Solid Waste Incinerator
  • High Combustion Efficiency Waste Management System Medical Solid Waste Incinerator
Find Similar Products

Basic Info.

Model NO.
HR-Y
Certification
ISO
Automation
Automatic
Treatment
Burning
Fuel
Diesel Oil, Natural Gas, Lps
Service Life
10-15 Years
Factory Establishment
in 2007
R&D Personnel
More Than 20 People
Voltage
380V/220V
Function
Waste Treatment/Waste Management
Blackness of Exhaustion
Ringelman <1
Type of Waste
Medical Waste
Color
Customized
Feeding Type
Hydraulic Feeding Device
Burning Rate
99.9%
Transport Package
Container, Bulk Cargo
Specification
Customized
Trademark
Hua Rui
Origin
Jiangsu, China
HS Code
8417809090
Production Capacity
300 Sets/Year

Packaging & Delivery

Package Size
4000.00cm * 3000.00cm * 2000.00cm
Package Gross Weight
300000.000kg

Product Description

Scope of application:
Viscera cut by medical bistoury, medical auxiliary material, one-time injector and other medical garbage.

Characteristics:
1. Automatically fill the material, and automatically output the ash;
2. Without any smoke, smell or second public pollution, dry and low burning and running cost;
3. Incinerator body adopts the revolving type. Mill and multiple-phase burning have good burning effect;
4. Cremate inside out, less ash, and heat alkali burning rate is over 90%;
5. Continually fill the material, every kind of garbage with high water containing rate and a little water could be plunged in to burn together.
6. Advanced automatic control technology ensures safe and reliable operation of equipment, low operating cost and remarkable economic benefits.
7. High efficiency: without any smoke,any smell or second public pollution;
8. Save energy: science leading structure, the treatment is more complete, and running cost is lower;
9. Safe and reliable: mainly adopt automatic controlling System with low malfunction rate, convenient repair and maintenance;
10. Exhaust  reaches national standard: have high-efficiency tail gas disposal device such as  secondary combustion chamber, heat exchange, dust removal and so on. Its tail gas could accord with national newest exhaust standard.


Hazardous waste handling capacity:50-5000kg/h

Safety indicators
1. The burner of the incinerator is equipped with a safety protection device, which will automatically cut off the fuel supply when the burner starts abnormally.
2. Before the incinerator stops running, there is a combustion chamber cooling program (normal shutdown and safety program shutdown). When the temperature drops to the set value, the cooling program ends and the incinerator stops working.
3. The equipment is equipped with leakage protection device. When the temperature is 40 degrees and the relative humidity is 85%, the insulation resistance of the electrical circuit is greater than 2 , and it can withstand the experimental voltage of 1min power frequency (50Hz) and 1500V. The positioning of each part is accurate and the connection is reliable.
4. Oil, water and gas paths have been sealed pressure test, no leakage phenomenon.
5. Alarm system:
1) Power indicator and switch of incinerator device;
2) Residual burning timing device is to ensure no residual flammable gas and organic matter in the furnace. The operation is safe and reliable ;
3) Overload protection device to protect the motor from overload, negative pressure frequency conversion control;
4) High and low temperature control interlocking.
 
Design ideas:
According to the characteristics of the project, the rotary kiln incinerator is selected, which can burn solid and liquid at the same time. Especially for chemical residue, sludge, organic waste liquid, industrial solid waste, etc.,
it is the preferred furnace type for comprehensive waste disposal center. Rotary kiln incinerator is built in a cylindrical metal shell insulation brick, horizontal slightly inclined, through the overall rotation of the furnace body to achieve uniform mixing and move to the discharge end along the inclined Angle. This incinerator adopts flue gas directional design. Through the rotation of the furnace body, the waste is constantly rolling and stirring to ensure the uniformity of heating, and the residence time of the waste in the rotary kiln can reach 0.5-1 hours, which can ensure that the waste is fully heated and the organic matter is fully removed.                                       
At the same time, it equips with a second combustion chamber and the waste gas generated by the rotary kiln incinerator is again incinerated at high temperature (1100ºC) to ensure the removal efficiency of organic matter. According to the use of temperature ≥1100ºC and flue gas residence time ≥2 seconds selects furnace type. After flue gas cooling, the tail gas is mainly purified, mainly from the removal of acidic components and nitrogen oxides, adsorption of harmful components and dust particle collection for equipment selection. 

Incinerator device includes the following equipment:
Feed hydraulic transmission device, waste liquid conveying pipeline system, rotary kiln body, the primary burner, the secondary combustion chamber, the secondary burner, water cooled cyclone dust removal, quench acid stripping tower, mist separation tower, exhaust fan, independent chimney, alkali storage tank and conveying system, lye pump, blower and air supplying system, electrical system, instrument control system, automatic ash device, system installation and maintenance's platform and support, etc.

Brief introduction of main process flow:
1) First, open the blower and purge the residual gas and other flammable and explosive gases in the furnace to prevent explosion after ignition.
2) Before ignited by the burner, please open the induced draft fan first and purge the furnace for five minutes. The fuel diesel is transported through pipelines and ignited by ignition burners. The heat release from the burner increases the temperature of the rotary kiln and the secondary chamber slowly.
3) Solid waste is fed into the rotary kiln by the feeding system, and the combustion temperature is controlled at 850ºC by controlling oxygen supply. The waste liquid enters the rotary kiln or secondary combustion chamber through the waste liquid pipeline.
4) The flue gas produced by rotary kiln enters into the secondary chamber, and the ash and slag produced by incineration is discharged automatically by wet scraper.
5) The flue gas produced by incineration is further burned at high temperature in the secondary combustion chamber assisted by organic waste liquid, and the combustion temperature is increased to 1100ºC to make the incineration more complete and achieve the effect of smokeless, odorless and no secondary pollution. The residence time of flue gas in the second chamber are 4.0 seconds, so that the trace organic matter and dioxins in flue gas can be fully decomposed. The decomposition efficiency is more than 99.99% to ensure that the undecomposed organic components and carbon particles in flue gas completely decomposed at about 1100ºC. Multi-stage combustion is used in the secondary combustion chamber to effectively inhibit the formation of nitrogen oxides.
6) The flue gas from the secondary combustion chamber enters into the water-cooled cyclone dust collector, and the ash content in the flue gas is settled by centrifugal force in the cyclone dust collector, which improves the cleanliness of the flue gas.
7) The flue gas from the cyclone enters the semi-dry quench tower. By the pressure pump, the reaction tower at the top of the two-fluid nozzle enters into the reaction tower, through the two-fluid nozzle atomized into small droplets and the atomized droplets are subjected to the hot flue gas upward, near the nozzle to form a high density area of the droplets are suspended, by adjusting the injection amount to control the temperature within 1 second quickly reduced to about 200 ºC, thus the regeneration of dioxins are effectively inhibited. At the same time, some sparks in the flue gas are extinguished by spraying water mist, protecting the subsequent cloth bag from being burned.
8) Then the flue gas enters into the spray washing tower and wet packing washing tower device. The main function is to wash away the acid gas in the flue gas.
9) The flue gas from the spray tower is discharged directly into the chimney after passing through the induced draft fan.


Oxidative chemical reaction of combustion:
CXHYOZ + O2 → CO2↑ + H2O
CXHYClZ + O2 → CO2↑ + HCl↑+ H2O
CXHYSZ + O2 → CO2↑ + SO2↑+ H2O

Lye removal of sulfur and chlorine:
HCl + NaOH → NaCl + H2O
SO2 + 2NaOH → Na2SO3 + H2O
 
High Combustion Efficiency Waste Management System Medical Solid Waste Incinerator
 
High Combustion Efficiency Waste Management System Medical Solid Waste Incinerator
 
High Combustion Efficiency Waste Management System Medical Solid Waste Incinerator
 
High Combustion Efficiency Waste Management System Medical Solid Waste Incinerator
 
High Combustion Efficiency Waste Management System Medical Solid Waste Incinerator
 
Yixing Huarui Incinerator Technology Development Co., Ltd. was established in 2007, with a registered capital of 58 million yuan, more than 140 employees, fixed assets of 80 million yuan, covering an area of 33,000 square meters.
The company is a high-tech enterprise recognized by the state, with the third-level qualification of professional contracting of environmental protection engineering, and has passed the ISO9001:2015 international quality management system certification.
The company specializes in the production of liquid, gas, solid and other kinds of waste incinerator, industrial waste water treatment equipment, such as: industrial hazardous waste incinerator, chemical, pharmaceutical industry incinerator.
The main types of furnaces are: rotary kiln, solid incinerator, liquid incinerator, exhaust gas direct combustion furnace, RTO regenerative incinerator, comprehensive incinerator, medical waste incinerator, etc.
Company has advanced scientific management and modern testing means, reasonable sales price, superior quality products perfect after-sales service to win the user's extensive praise and trust, for all kinds of waste treatment engineering preliminary feasibility study, design and development, manufacturing, installation, debugging, training and after-sale tracking service to provide one-stop service.

Our products are very popular throughout all of China, but also exported to the Southeast Asia, Africa, South America, Middle East and other countries. Customers are highly satisfied. 
We sincerely and warmly welcome friends and customers from home and abroad to visit our company!
High Combustion Efficiency Waste Management System Medical Solid Waste Incinerator
 
High Combustion Efficiency Waste Management System Medical Solid Waste Incinerator
 
High Combustion Efficiency Waste Management System Medical Solid Waste Incinerator
 
High Combustion Efficiency Waste Management System Medical Solid Waste Incinerator
 
High Combustion Efficiency Waste Management System Medical Solid Waste Incinerator
 
 
 
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now